This section provides information on which resources the room should have available to it. Please refer to the correct room setup diagram below for a visual representation of these requirements.

  • Access to switchable power connection for wall-mounted base stations (110-240 VAC, 50 Hz-60 Hz)
  • Access to six power plugs behind the computer for the Cleanroom Simulator workstation (110-240 VAC, 50 Hz-60 Hz)

  • Access to stable internet connection for the Cleanroom Simulator workstation. An Ethernet connection is recommended. Find the network requirements on the following page.
  • Locations on the walls for mounting two base stations and one Wireless link box including proper cable routing. The mounting of this equipment requires holes to be drilled into the walls.

1
Switchable power socket
for wall-mounted base station
(110-240 VAC, 50 Hz-60 Hz)
2
Switchable power socket
for wall-mounted base station
(110-240 VAC, 50 Hz-60 Hz)
3
Six power plugs are required
for the DeepTraining
workstation (110-240 VAC,
50 Hz-60 Hz)
4
An Ethernet connection is
recommended for a stable
internet access.

Frequently Asked Questions

  • Electrician – Prepare power plugs and ethernet port
  • Facility manager – Drill holes for the holders and setup the table
  • IT Technician – Setup the workstation and equipment
For the following countries we can provide country specific plugs: 

  • EU countries
  • USA

Please ask our support team for all other countries.

The system does not rely on an internet connection for normal operation. There are metrics collected in the background and pushed to our Microsoft servers. In case you perform training offline a log is created on the computer. Furthermore, Internet is required to keep the device updated.

Bandwidth requirements: 

  • Daily usage: < 100 MB / training session
  • Updates: < 5 GB / update – usually monthly